Aviation & Train industries Products & Services
Français English Chinese
EASA DOA / POA / Part 145

Commercial and information :

     Phone : +33 (0)1.73.27.20.00


  • Permanency :

     Aero : +33 (0)6.09.13.88.32

     Bio decontamination® :
     +33 (0)6.09.13.88.32


Send us a message :

     E-mail : info-aero...

▼ A question ? ▲ Close

Cabin to cargo quick change conversion

Facing variable air transport demand (passengers, cargo, special layout...) UUDS developed some solutions for ‘‘QUICK CABIN CHANGE’’ from passengers configuration to cargo configuration.

Solution depends on various criteria:

• Volume and weight transported
• Packaging type
• Type and value of freight
• Ground time available for conversion
• Certification aspect

“P2F light” strategy

Cost & time effective solution facing Cargo transport market

• Missing capacities available
• No Freighter or P2F available before 2025
• End of temporary Exemptions “cargo in cabin” in July 2022
• Growing e-market demand (refer latest IATA publication)
• Increase Aircraft Asset (Cargo or Pax)

UUDS Solution:

• A330 / B777 / B737 / A320
• EASA and FAA approved
• Turn key all inclusive Contract (STC, KITs, MRO)
• Main deck converted into Cargo Class E
• UUDS Cargo Loading System
• Next slot available in 5 months

Scope

Permanent EASA STC

• Smoke detection system
• Lighting system & Lining
• Fire extinguishing system
• Cargo on fixed pallets
• UUDS conveyor CLS
• Standard NETs
• Window plugs
• Loading by PAX doors
• 24-26 loading areas
• Supernumerary seats & associated oxygen & smoke barrier

  • Cabin to cargo conversion
  • Cabin to cargo conversion
  • Cabin to cargo conversion
  • Cabin to cargo conversion
  • Cabin to cargo conversion
  • Cabin to cargo conversion
  • Cabin to cargo conversion
  • Cabin to cargo conversion

“P2F light” A330-300 Case Study

“P2F light Class E”

• Aircraft is modified as a P2F but without CARGO DOOR and standard CLS.
• STC is permanent but also reverse (in few weeks working Party)
• No limitation in Cargo type (Class E).
• Loading / unloading in 3 to 4 hours.

Main deck capacity :
• 290 m3
• 37 tones

  • A330-300 Case Study
  • A330-300 Case Study